In the summer of 2009, Westwood Curtis Construction removed an existing rural bridge outside of Lima, Montana and replaced it with a stronger concrete pre-cast concrete bridge. The project timeline to complete the project was extremely tight due to increasing water levels of the stream, so Westwood Curtis was able to completely remove the old bridge and have a new bridge installed in its place in less than 3 weeks. Westwood Curtis worked closely with Beaverhead County, Montana on the project and the town of Lima.