In 2015 Westwood Curtis completed work on a 2.4 mile paved pathway which included a precast concrete box culvert underpass with wingwalls, lighting and associated drainage; soldier pile retaining walls, gabion retaining walls, culvert, signage and landscaping. With the project completed, pathway systems between the west bank of the Snake River and the Highway 89 pathway system were finally linked together resulting in close to 45 miles of connected pathway in Teton County.