Beginning in March 2011, Westwood Curtis Construction installed a 251 foot long, 3-span steel bridge crossing the Gros Ventre River in Grand Teton National Park. Construction of the bridge included 685 feet of hydraulic-driven steel piles, concrete abutments, concrete pier caps, retaining walls and site grading. The project was completed on time while working closely with Teton County, Federal Highway and Grant Teton National Park in conjunction with two separate pathway projects being constructed concurrently.