During thewinter of 2019-2020 Westwood Curtis Construction constructed a private bridge over Fish Creek in Wilson, Wyoming. Construction crews demolished an existing wooden bridge prior to construction of the new 82’ long steel bridge. Cast-in-place concrete abutments and piers were integrated with steel H-piles driven into the creek. All of this work was performed during the winter prior to fishs pawning season and 24 hour dewatering and diversion of the stream was required for nearly 4 months.