Completed in 2010, Westwood Curtis Construction provided services necessary for the building of this multi-use building in Jackson, Wyoming. Prior to construction, the existing building was demolished and a new foundation built in its place. Shoring or the adjacent roadways and buildings was necessary to construct such a grand building. Other elements of the construction included mass excavation, storm drains, water connections, sewer connections, concrete surface drainage and asphalt paving.