Excavated and installed a 980 foot tunnel underneath Snow King Mountain Resort to connect to a new subdivision currently being constructed. Due to the rapid pace of the design process, Westwood Curtis Construction, Inc. was called upon from the beginning to perform valued engineering to determine construction methods, precast tunnel dimensions, timescale, and scheduling of work. At its deepest, the tunnel was excavated 80 feet below existing elevations and received compliments from OSHA inspectors with regards to overall safety procedures and compliance.