During September and October of 2010, Westwood Curtis Construction updated stormwater control devices at the Ralph Wenz Airport near Pinedale, Wyoming. A phased construction approach was necessary for construction to maintain the flow of aircraft on taxiways and to eliminate equipment conflicts. Approximately 850 feet arched culvert, manholes and diversion structures were installed within a 20 day period as required by the airport.