Excavated and installed a 101 foot tunnel underneath Highway 22 to safely transfer pathway traffic across the road. This precast concrete tunnel was installed during peak tourist season on the busiest non-interstate in Wyoming. Traffic was maintained for both directions of travel for the duration of the project which included storm drains, dry utilities and mass excavation.