Over the course of multiple project phases, Westwood Curtis Construction, Inc. installed 20,000+ lineal feet of sewer main during high groundwater conditions and winter weather. Also included in this project was the installation of manholes, services, HDPE pressure sewer, and 3 12’ diameter lift stations ~25 feet deep each. The project was completed ahead of schedule which included grading of road base and paving of roadways.